ANF FR154 Bridge Replacement
SOL #: 12445526B0005Combined Synopsis/Solicitation
Overview
Buyer
Agriculture
Forest Service
USDA-FS, CSA EAST 13
Atlanta, GA, 303092449, United States
Place of Performance
PA
NAICS
Highway (237310)
PSC
Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Mar 5, 2026
2
Last Updated
Apr 3, 2026
3
Submission Deadline
Apr 7, 2026, 5:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is soliciting bids for the ANF FR154 Bridge Replacement project in Warren County, PA. This Total Small Business Set-Aside opportunity requires the demolition and disposal of the existing bridge and the procurement and installation of a new 56-foot clear, single-span, single-lane box beam bridge. All work must adhere to Federal Highway Projects FP-14 and Forest Service Supplemental Specifications (FSSS). Bids are due April 7, 2026, at 1:00 PM Eastern.
Scope of Work
The project involves the complete replacement of the Farnsworth Bridge located on Forest Road 154. Key tasks include:
- Demolition and disposal of the existing 1934 steel bridge.
- Procurement and installation of a new 56-foot clear, single-span, single-lane prestressed concrete box beam bridge (61-foot overall span).
- Adherence to designs and specifications outlined in FP-14 and FSSS.
- Specific requirements include 0.375-inch wall thickness for 14-inch pipe piles, with taper tubes not acceptable for cast-in-place piles.
- In-stream work is restricted seasonally (Oct 1 – Jan 1, Feb 15 – June 1), with work within the stream to be completed by October 1. Construction may begin as early as May 15.
- The Forest Service will complete required tree removal by March 31.
Contract Details
- Contract Type: Firm Fixed Price (FFP) Invitation for Bid (IFB).
- Estimated Magnitude: Between $500,000 and $1,000,000.
- Set-Aside: Total Small Business Set-Aside (NAICS 237310, size standard $45M).
- Performance Period: Completion no later than September 30, 2026, including site cleanup. The government will consider delays if the contract award is delayed.
- Location: FR 154, Mead Township, Warren County, Pennsylvania.
- Wage Requirements: Davis-Bacon Act prevailing wages apply for Heavy and Highway Construction Projects in Pennsylvania.
Submission & Evaluation
- Bid Due Date: April 7, 2026, at 1:00 PM Eastern.
- Submission Method: Email to debra.brinn@usda.gov.
- Required Documents: A complete bid must include Attachment 02 Schedule of Items with all items priced and acknowledgement of any amendments.
- Bid Bond: Required for bids exceeding $150,000.00, using Standard Form 24 (SF-24) in the amount of $155,000 or 20% of the total bid. Surety must be certified via Treasury's Circular 570.
- Evaluation: Award will be made to the lowest priced, responsible offeror who is responsive to the solicitation.
- Bid Opening: Will be held via Microsoft Teams on April 7, 2026, at 1:00 PM Eastern. Meeting link and dial-in details are provided in the solicitation.
- Notes: Offerors must hold prices firm for 90 calendar days. A site inspection is urged. Q&A is closed.
People
Points of Contact
BRINN, DEBRA KPRIMARY
Files
Versions
Version 8Viewing
Combined Synopsis/Solicitation
Posted: Apr 3, 2026
Version 7
Combined Synopsis/Solicitation
Posted: Apr 1, 2026
Version 6
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Mar 19, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Mar 16, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Mar 13, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 5, 2026