Cherry Creek Dam (CO) Rehab Gate Stems

SOL #: W9128F26QA016Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W071 ENDIST OMAHA
OMAHA, NE, 68102-4901, United States

Place of Performance

Aurora, CO

NAICS

Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance (811310)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Special Industry Machinery (J036)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 18, 2026
2
Last Updated
Mar 31, 2026
3
Submission Deadline
Apr 10, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers, Omaha District, is soliciting proposals for the rehabilitation of Service Gate Stems No. 2 and No. 5 at the Cherry Creek Dam in Aurora, Colorado. This 100% Total Small Business Set-Aside opportunity aims to ensure the continued safe and reliable operation of the intake service gates. Proposals are due by April 10, 2026, at 2 PM CDT.

Scope of Work

This contract encompasses the comprehensive rehabilitation of Service Gate Stems No. 2 (Base) and No. 5 (Option). The scope includes:

  • Cleaning, polishing, and measuring cylinder rods, with re-chroming specifically for gate hanger cylinders. The requirement for main stem re-chroming has been removed by amendment.
  • Honing inner cylinder walls to remove minor scoring.
  • Cleaning and inspecting piston rings.
  • Replacing oil packing, glands, studs, nuts, and gaskets in the hydraulic cylinder and gate hanger assembly.
  • Installing a new scraper-style wiper in the water packing seat.
  • The work requires multiple mobilizations and demobilizations, with a performance period of 180 calendar days after award.

Contract Details

  • Contract Type: Firm Fixed Price (contemplated).
  • NAICS Code: 811310, Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance, with a $12.5 Million size standard.
  • Place of Performance: Cherry Creek Dam, Aurora, Colorado.
  • Contracting Office: USACE Omaha District, 1616 Capitol Ave, Omaha, NE 68102-4901.
  • Point of Contact: Tony Manna (tony.j.manna@usace.army.mil, 402-995-2907).

Submission & Evaluation

  • Submission: Offers must be submitted electronically as a single PDF document to Tony Manna (tony.j.manna@usace.army.mil).
  • Evaluation Criteria: Proposals will be evaluated based on Past Performance and Experience (significantly more important than price) and Price (used to break ties).
  • Requirements: Minimum of two past performance references (within 7 years) related to hydraulic hoist cylinder repair/rehab. Maximum of four experience examples illustrating similar function, scope, complexity, and size.
  • Warranty: A minimum one (1) year warranty on all work, materials, and workmanship is required.

Key Dates & Amendments

  • Solicitation Issue Date: March 19, 2026.
  • Proposal Due Date: April 10, 2026, at 2 PM CDT.
  • Questions Due: No later than seven (7) calendar days prior to the quote due date (this date has passed, but good to note the original instruction).
  • Amendment 0001 (April 1, 2026): Removed the "hydraulic cylinder main stem re-chroming" requirement and updated the Performance Work Statement and Attachment A accordingly. Confirmed NAICS code.
  • Site Visit: An optional site visit was held on March 30, 2026.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: Mar 31, 2026
Version 3
Solicitation
Posted: Mar 26, 2026
View
Version 2
Solicitation
Posted: Mar 9, 2026
View
Version 1
Pre-Solicitation
Posted: Feb 18, 2026
View
Cherry Creek Dam (CO) Rehab Gate Stems | GovScope