DDAA WEAPON SPECIAL PACKAGING INSTRUCTIONS (SPI) BOXES

SOL #: SP330026Q0056Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA DISTRIBUTION
NEW CUMBERLAND, PA, 17070-5008, United States

Place of Performance

Anniston, AL

NAICS

Corrugated and Solid Fiber Box Manufacturing (322211)

PSC

Boxes, Cartons, And Crates (8115)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 2, 2026
2
Last Updated
Apr 1, 2026
3
Submission Deadline
Apr 2, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) Distribution Anniston, AL (DDAA) is soliciting quotes for Special Packaging Instructions (SPI) Boxes for M2A1, M4, M240, and M240B weapons. This is a Firm Fixed-Price (FFP) Indefinite-Delivery-Indefinite-Quantity (IDIQ) contract issued as a 100% Small Business Set-Aside. The maximum contract value is $600,000.00 over a five-year ordering period. Quotes are due by April 2, 2026, at 1:00 PM EST.

Scope of Work

This opportunity, under Solicitation SP3300-26-Q-0056, requires the procurement of complete SPI kits, including fiberboard boxes and associated packaging materials, for various weapon systems. All packaging materials must adhere to Military Preservation Method MIL-STD-2073 requirements per specific SPIs, be packaged according to ASTM 3951, and marked in accordance with MIL-STD-129P. A critical requirement is that cushioning must be made of fiberboard; foam is not accepted.

Contract Details

  • Contract Type: Firm Fixed-Price (FFP), Indefinite-Delivery-Indefinite-Quantity (IDIQ)
  • Ordering Period: Five years
  • Maximum Value: $600,000.00
  • Minimum Order: $2,500.00
  • Maximum Order: 1,000 KITS for a single item, or 4,000 KITS for a combination of items in a single day.
  • Delivery: 45 days After Receipt of Order (ARO)
  • Set-Aside: 100% Small Business Set-Aside (FAR 19.5)
  • Product Service Code (PSC): 8115 (Boxes, Cartons, And Crates)
  • NAICS Code: 322211 (Corrugated and Solid Fiber Box Manufacturing) with a size standard of 1,250 employees.

Submission & Evaluation

Quotes must be submitted electronically via email to brian.keckler@dla.mil by the deadline. Prices must remain firm for 60 calendar days. Evaluation will be on an Acceptable/Unacceptable basis for Technical Capability and Past Performance. Award will be made to the lowest priced quote that meets or exceeds the acceptability standards for non-cost factors. Technical capability requires demonstrating understanding of requirements and providing manufacturer details. Past performance will also be evaluated on an acceptable/unacceptable basis.

Key Clarifications & Amendments

Several amendments and Q&A documents have been issued. The latest clarifications confirm that the requirement is for complete SPI kits. VCI barrier bags have been omitted from material descriptions due to previous issues. Fiberboard cushioning is explicitly required, and foam is not acceptable for CLIN 0001 and other relevant items. Revised Schedules of Supply (dated March 19, 2026) have been issued to address discrepancies in material numbers, figures, and CLIN descriptions. Product samples are not required with quotations.

Contact Information

For questions, contact Brian Keckler at brian.keckler@dla.mil or 717-770-8418. Questions must be submitted at least four calendar days before the closing date.

People

Points of Contact

Brian KecklerPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: Apr 1, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Mar 23, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Mar 20, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Mar 19, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 17, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 2, 2026
View