DDAA WEAPON SPECIAL PACKAGING INSTRUCTIONS (SPI) BOXES

SOL #: SP330026Q0056Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA DISTRIBUTION
NEW CUMBERLAND, PA, 17070-5008, United States

Place of Performance

Anniston, AL

NAICS

Corrugated and Solid Fiber Box Manufacturing (322211)

PSC

Boxes, Cartons, And Crates (8115)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 2, 2026
2
Last Updated
Apr 1, 2026
3
Submission Deadline
Apr 2, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) Distribution is soliciting quotes for Special Packaging Instructions (SPI) Boxes for various weapons, including M2A1, M4, M240, and M240B. This is a Combined Synopsis/Solicitation (RFQ SP3300-26-Q-0056) issued as a 100% Small Business Set-aside. The contract will be a Firm-Fixed-Priced (FFP), Indefinite-Delivery-Indefinite-Quantity (IDIQ) with a five-year ordering period and a maximum value of $600,000. Quotes are due by April 2, 2026, at 1:00 PM EST.

Scope of Work

The requirement is for complete SPI kits, encompassing fiberboard boxes and all associated packaging materials. All packaging must adhere to Military Preservation Method MIL-STD-2073, ASTM 3951, and MIL-STD-129P marking standards. Key items include:

  • M2A1, M4, M240, and M240B SPI boxes.
  • Cushioning: Must be fiberboard; foam is generally not accepted, except for foam-in-place consistency for support pieces if specified in the SPI.
  • Omitted Materials: VCI wrap, VCI barrier bags, tape, and bore tubes are explicitly not required.
  • Packing: Level B packing (fiberboard boxes only) is required for CLINS 0002-0004; Level A wooden crates are not needed.
  • Blocking and Bracing: Specific fiberboard requirements apply for various SPIs (e.g., ASTM D4727, DW, GRADE 350/275).

Contract Details

  • Type: Firm-Fixed-Priced (FFP), Indefinite-Delivery-Indefinite-Quantity (IDIQ)
  • Ordering Period: Five years
  • Maximum Value: $600,000.00
  • Minimum Order: $2,500.00
  • Maximum Order: 1,000 KITS for a single item, or 4,000 KITS for a combination of items in a single day.
  • Delivery: 45 days After Receipt of Order (ARO)
  • Place of Performance: DLA Distribution Anniston, AL (DDAA)

Submission & Evaluation

  • Response Due: April 2, 2026, 1:00 PM EST.
  • Submission Method: Electronic via email to brian.keckler@dla.mil. The subject line must be "SP3300-26-Q-0056 Quotation – “Company Name”".
  • Quote Validity: Prices must be held firm for 60 calendar days.
  • Evaluation: Quotes will be evaluated on an Acceptable/Unacceptable basis for Technical Capability (demonstrating understanding, providing manufacturer info) and Past Performance. Award will be made to the lowest priced quote that meets or exceeds the acceptability standards for non-cost factors.
  • Amendments: Five amendments have been issued, providing multiple rounds of Questions and Answers and a revised Schedule of Supplies (dated March 19, 2026). Bidders must acknowledge all amendments.

Contact Information

For questions, contact Brian Keckler at brian.keckler@dla.mil or 717-770-8418.

People

Points of Contact

Brian KecklerPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: Apr 1, 2026
View
Version 6Viewing
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Mar 23, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Mar 20, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 19, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 17, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 2, 2026
View