DSCR B41 Parking Lot Repair

SOL #: SP470326Q0027Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DCSO RICHMOND DIVISION #1
RICHMOND, VA, 23237, United States

Place of Performance

GRASSY CREEK, VA

NAICS

Highway (237310)

PSC

Maintenance Of Highways/Roads/Streets/Bridges/Railways (Z1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 13, 2026
2
Last Updated
Apr 1, 2026
3
Submission Deadline
Apr 8, 2026, 3:59 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA), specifically DCSO Richmond Division #1, has issued a Request for Quote (RFQ), solicitation number SP4703-26-Q-0027, for DSCR B41 Parking Lot Repair at the Defense Supply Center Richmond, VA. This opportunity is a 100% Total Small Business Set-Aside for firms specializing in parking lot repair. The resulting contract will be a firm-fixed price award with a 60-day period of performance. Quotes are due by end of day, April 7, 2026.

Scope of Work

The project involves repairing and paving the parking infrastructure of Building 41 at DSCR to provide a permanent parking solution and enhance site security. Key tasks include:

  • Clearing and grading the site, removing vegetation, debris, and unsuitable soil.
  • Removing existing gravel and constructing new parking and driving areas (approx. 3,500 sqft), including 8 standard parking stalls and a minimum 24 ft wide driving aisle.
  • Installing sub-base material and asphalt or concrete surface per UFC 3-250-01.
  • Installing parking blocks, striping spaces, and adding a concrete sidewalk section.
  • Installing a minimum of two exterior lighting fixtures on Building B41.
  • Ensuring a minimum 2% grade for positive drainage and including stormwater breaks.
  • Backfilling areas with topsoil and hydroseeding, with a requirement for 1-year grass re-seeding maintenance.
  • Material specifications for the 4" open-graded drainage layer require a hard, durable, crushed aggregate meeting RDM or OGM gradation (UFC 3-250-01, Chapter 20) with minimum 1,000 ft/day permeability. Compaction requires six passes of a 10-ton vibratory roller. Additional installation requirements include a granular separation layer or geotextile fabric, uniform aggregate placement, and protection of the completed drainage layer.

Contract Details

  • Contract Type: Firm-Fixed Price
  • Period of Performance: 60 days from contract award.
  • Magnitude of Construction: Between $25,000 and $100,000.
  • Liquidated Damages: $500 per calendar day of delay.
  • NAICS Code: 237310 (Parking Lot Repair)
  • Small Business Size Standard: $45M
  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Z1LB (Maintenance Of Highways/Roads/Streets/Bridges/Railways)

Key Requirements

Offerors must be within a 120-mile commutable driving distance to the DSCR facility, with the point of mobilization owned by the prime contractor. Contractors must be registered in the System for Award Management (SAM) prior to award. A Department of Labor Wage Determination (VA20260111) for highway construction in Chesterfield and Colonial Heights, VA, is applicable and must be used for labor cost calculations. Contractor qualifications include a minimum of five years of relevant experience, expertise in concrete construction, familiarity with DoD construction standards (UFC), OSHA certification, and the ability to obtain base access clearance.

Evaluation

Award will be made to the Lowest Priced, Technically Acceptable (LPTA) offeror. Past performance, pulled from CPARS and SPRS, will be considered as part of Technical Acceptability. Partial proposals will not be accepted.

Key Dates & Submission

People

Points of Contact

Brandon JumpPRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 5
Solicitation
Posted: Apr 1, 2026
View
Version 4Viewing
Solicitation
Posted: Mar 31, 2026
Version 3
Solicitation
Posted: Mar 30, 2026
View
Version 2
Solicitation
Posted: Mar 17, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 13, 2026
View
DSCR B41 Parking Lot Repair | GovScope