GAOA Bell Smith Springs Repaving and Parking
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA-Forest Service, Shawnee National Forest is soliciting bids for GAOA Bell Smith Springs Repaving and Parking in Pope County, Illinois. This project involves comprehensive roadwork and related improvements. This is a Total Small Business Set-Aside with an estimated magnitude between $1,000,000 and $5,000,000. Proposals are due by March 31, 2026, at 3:00 PM ET.
Scope of Work
The project encompasses mobilization, drainage excavation, clearing and grubbing, aggregate base and surface placement, roadway reconditioning, roadway excavation and new roadway construction, culvert removal and installation, small culvert headwall removal and installation, and specialty masonry for a historic stone headwall. Specific work is detailed for Forest Roads 848, 848A, and 849, including chip sealing, repaving, widening, and the creation of new parking areas. The work is located within the Shawnee National Forest on the Hidden Springs Ranger District.
Contract & Timeline
- Opportunity Type: Solicitation
- Contract Type: Firm Fixed Price (FFP)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 237310, Highway, Street and Bridge Construction (Size Standard: $45.0M)
- Period of Performance: April 1, 2026, to October 30, 2026
- Proposal Due: March 31, 2026, at 3:00 PM ET (extended by Amendment 0002)
- Questions Due: March 12, 2026, at 12:00 PM ET
- Published Date: April 1, 2026
Evaluation
Award will be made to the lowest priced, responsible offeror who is responsive to the solicitation. Offerors must hold prices firm for 90 calendar days from the bid receipt date.
Key Requirements & Notes
- A 20% Bid Bond is required with the quote/offer submission.
- 100% Performance and Payment Bonds are required within 10 days after award.
- Bids must be submitted via email to paula.sales@usda.gov and CC bradley.higley@usda.gov.
- Contractors must call JULIE (800-892-0123 or 811) before any earth-disturbing activities for utility locates.
- The contractor is responsible for traffic control, including furnishing and maintaining barricades and warning signs as per MUTCD and Forest Service approval.
- Site restoration, including contouring, topsoil re-spreading, seeding, and mulching of disturbed areas, is required.
- Prevailing wage rates for Heavy and Highway Construction in Illinois (GDN IL20260016) apply.
- Work is to begin within 10 days after the Notice to Proceed.
- No third-party inspections or permitting are required. The Government will stake project limits, and the contractor is responsible for maintaining stakes.
- Chipseal is required on all existing roads and parking lots; newly constructed gravel lots do not require chipseal.