GAOA Bell Smith Springs Repaving and Parking
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Opportunity Overview
The USDA-Forest Service, Shawnee National Forest has issued a Solicitation for the GAOA Bell Smith Springs Repaving and Parking project in Pope County, IL. This is a Total Small Business Set-Aside (FAR 19.5) under NAICS code 237310 (Highway, Street and Bridge Construction, $45.0M size standard). The project magnitude is estimated between $1,000,000 and $5,000,000. Award will be made to the lowest priced, responsible, and responsive offeror.
Scope of Work
The project involves comprehensive roadwork and related improvements. Key tasks include:
- Mobilization, drainage excavation, brushing, clearing, and grubbing.
- Aggregate base and surface placement, roadway reconditioning, and new roadway construction.
- Culvert removal and installation, including small culvert headwall removal and installation.
- Specialty masonry for the removal and replacement of a historic stone headwall.
- Detailed work descriptions for specific forest roads (848, 848A, 849) cover chip sealing, repaving, widening, culvert replacements, and installation of new features like french drains and parking areas.
- Construction methods and materials are guided by FP-14 Forest Service Supplement specifications and detailed drawings for culverts, french drains, road cross-sections, chip seals, concrete headwalls, silt fences, and parking areas.
Contract Details & Requirements
This is an anticipated Firm Fixed Price (FFP) contract. The Period of Performance has been updated to April 1, 2026, to October 30, 2026. Contractors must adhere to prevailing wage rates for Heavy and Highway Construction in Illinois, as detailed in General Decision Number IL20260016. Essential operational requirements include calling JULIE for utility locates, providing traffic control with Forest Service approval, ensuring proper drainage, and performing site restoration (contouring, topsoil, seeding, mulching). Contractors must minimize public inconvenience, obtain CO approval for road closures and material storage, and provide adequate safety measures. A bid bond of 20% is required with the submission, and Performance and Payment Bonds (100% of contract price) are due within 10 days of award. Offerors are urged to inspect the site.
Key Dates & Submission
- Questions Due: March 12, 2026, at 12:00 PM Eastern Time.
- Bids Due: March 26, 2026, by 2:00 P.M. Eastern Time.
- Bids must be submitted via email to paula.sales@usda.gov and CC bradley.higley@usda.gov.
- Offerors must hold prices firm for 90 calendar days from the bid receipt date.
Contacts
- Primary: Paula Sales (paula.sales@usda.gov)
- Secondary: Brad Higley (bradley.higley@usda.gov)