GAOA Bell Smith Springs Repaving and Parking
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA-Forest Service, Shawnee National Forest is soliciting bids for the GAOA Bell Smith Springs Repaving and Parking project in Pope County, Illinois. This Total Small Business Set-Aside opportunity involves comprehensive roadwork and related improvements. Bids are due by March 31, 2026, at 3:00 PM ET.
Scope of Work
This project requires construction services for repaving and parking area development within the Shawnee National Forest, specifically on the Hidden Springs Ranger District. Key tasks include:
- Mobilization, drainage excavation, brushing, clearing, and grubbing.
- Aggregate base and surface placement, roadway reconditioning, and new roadway construction.
- Culvert removal and installation, including small culvert headwall work.
- Specialty masonry for the removal and replacement of a historic stone headwall. The project magnitude is estimated between $1,000,000 and $5,000,000.
Contract & Timeline
- Contract Type: Firm Fixed Price (FFP).
- Set-Aside: Total Small Business Set-Aside (NAICS 237310, $45.0M size standard).
- Period of Performance: April 1, 2026, to October 30, 2026.
- Bid Due Date: March 31, 2026, at 3:00 PM ET.
- Questions Due Date: March 12, 2026.
- Published Date: March 26, 2026 (latest amendment).
Submission & Evaluation
Bids must be submitted via email to paula.sales@usda.gov and CC bradley.higley@usda.gov. Award will be made to the lowest priced, responsible offeror who is responsive to the solicitation. A 20% bid bond is required with the submission, and 100% Performance and Payment Bonds are required within 10 days of award. Offerors are urged to inspect the site.
Key Attachments
Important documents include the Schedule of Items, Specifications, Drawings, Location Maps, Wage Determination, General Notes, Road Log Work Descriptions, and the Statement of Work, which provide detailed technical requirements and operational guidelines.