Military Working Dog Kennel Hunter Army Airfield, Savannah, Georgia
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The US Army Corps of Engineers (USACE), Savannah District, is soliciting proposals for a Firm Fixed Price Contract to construct a SOF Military Working Dog (MWD) Kennel (approximately 11,000 SF) at Hunter Army Airfield, Savannah, GA. This opportunity is an 8(a) Set-Aside. The response deadline is May 14, 2026.
Scope of Work
The project involves the construction of an approximately 11,000 SF MWD Kennel. This facility will include kennel administration offices, a veterinary exam and surgical suite, an isolation area, an operating room, a TA-50 locker area, latrines with showers, a tack room, food preparation and storage areas, indoor and outdoor kennels, and building utility support areas. Built-in systems will encompass fire alarm/mass notification, fire suppression, HVAC, energy management control system, electrical systems, and communications networks. Supporting facilities include site preparation, utilities, vehicle parking, access drives, curb and gutter, sidewalks, storm drainage, landscaping, and other site improvements. The scope also includes the demolition of an old kennel adjacent to the site.
Contract & Timeline
- Type: Firm Fixed Price Contract
- Set-Aside: 8(a) Set-Aside (FAR 19.8)
- Response Due: May 14, 2026, at 3:00 PM Z
- Published: May 1, 2026
- Amendments:
- Amendment 0004 (May 1, 2026): Adds RFO 52.222-90 clause.
- Amendment 0003 (April 30, 2026): Removes DFARS 252.204-7008, 252.204-7012, 252.204-7019, 252.204-7020, 252.204-7021, and 252.204-7025.
- Amendment 0002 (April 13, 2026): Includes new documents: Asbestos and lead surveys, Furniture, Fixtures, and Equipment (FF&E), Structural Interior Design (SID), and Veterinary Equipment. Clarifies that Amendment 0001 requires bidders to complete both updated bid acceptance schedules (pages 4-9 of B_08_Solicitation Amendment 0001) and sign/date SF 30 for acknowledgment.
- Amendment 0001 (April 3, 2026): Corrected bid acceptance schedule periods to include unit price column and grand total amount section.
Site Visit Information
Minutes and a sign-in sheet from the April 9, 2026, pre-proposal site visit are available. Attendees were advised to review the entire solicitation, specifications, drawings, and supporting documents, and to monitor for further amendments. Specific or technical questions must be submitted via ProjNet as a Bidder Inquiry.
Contact Information
For inquiries, contact Sarai Hayward at sarai.hayward@usace.army.mil or 912-652-5348.