N--GC26 SCADA UPS REPLACEMENT

SOL #: 140R4026R0006Solicitation

Overview

Buyer

Interior
Bureau Of Reclamation
UPPER COLORADO REGIONAL OFFICE
SALT LAKE CITY, UT, 84138, United States

Place of Performance

Place of performance not available

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Electrical And Electronic Equipment Components (N059)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 15, 2026
2
Last Updated
Apr 3, 2026
3
Submission Deadline
Apr 27, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, Bureau of Reclamation has issued Solicitation 140R4026R0006 for the N--GC26 SCADA UPS REPLACEMENT project. This Total Small Business Set-Aside opportunity seeks a contractor to replace the SCADA Uninterruptible Power Supply (UPS) system at the Glen Canyon Dam in Page, Arizona. The project involves demolition of the existing system and installation of a new UPS, including all associated electrical work, integration, and testing. Proposals are due April 27, 2026, at 10:00 AM EDT.

Scope of Work

The contractor will be responsible for:

  • Demolishing and removing the existing SCADA UPS system and components.
  • Removing non-reusable conduit and conductors.
  • Providing and installing a new SCADA UPS system, including all necessary components, conduit, and conductors. The UPS must be a brand name or equal to Schneider Electric 480V UPS with External-Battery, meeting specific technical requirements.
  • Performing all electrical modifications, terminations, labeling, testing, commissioning, and cutover to minimize downtime.
  • Delivering shop drawings, submittals, factory/start-up support, training for operations staff, acceptance testing, as-built documentation, O&M manuals, and warranty support.
  • All work must comply with Bureau of Reclamation standards and applicable federal, state, and local codes. Detailed electrical drawings and specifications are provided as attachments.

Contract Details

  • Contract Type: Firm-Fixed-Price
  • Magnitude: Between $1,000,000 and $5,000,000
  • Period of Performance: 545 days from Notice to Proceed (NTP)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Place of Performance: Glen Canyon Dam, Hwy 89, Page, AZ 86040
  • Wage Rates: Construction Wage Rate Requirements (Davis-Bacon) apply, specifically Wage Determination AZ20260007 for Coconino County, Arizona (Heavy Construction).
  • Bonds: Performance (SF25) and Payment (SF25A) Bonds are required.

Submission & Evaluation

  • Proposals Due: April 27, 2026, at 10:00 AM Eastern Daylight Time (EDT).
  • Submission Method: Electronically via email to Megan Swift (Megan_Swift@ios.doi.gov). The email subject line must be: "Bureau of Reclamation Proposal: GCFD POWERPLANT UPS (SCADA EACSS) – 140R4026R0006".
  • Evaluation: Award will be made using Best Value-Tradeoff procedures per FAR Part 15, considering factors such as price, technical capability, past performance, and schedule. Proposals must remain valid for 60 days.

Key Dates & Contacts

  • Site Visit (Strongly Urged): April 9, 2026, at 8:30 AM Mountain Standard Time (MST) in Page, Arizona. Attendance must be confirmed via email.
  • Questions Due: April 15, 2026, at 10:30 AM EDT, submitted via email to Megan Swift.
  • Primary Contact: Megan Swift (mswift@usbr.gov, 3034452722).

People

Points of Contact

Swift, MeganPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Solicitation
Posted: Apr 3, 2026
View
Version 4Viewing
Solicitation
Posted: Apr 1, 2026
Version 3
Solicitation
Posted: Mar 27, 2026
View
Version 2
Pre-Solicitation
Posted: Mar 9, 2026
View
Version 1
Sources Sought
Posted: Jan 15, 2026
View