Initial Site Visit & RFI Responses for WWYK200131 - Repair Chilled Water System, Bldg. 2280
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This Special Notice from the Department of the Air Force provides RFI responses and details for the upcoming Two-Step Sealed Bidding solicitation to repair the Chilled Water System at Building 2280, Tinker Air Force Base, Oklahoma. This is a Total Small Business Set-Aside construction-only contract with an estimated magnitude exceeding $10,000,000. The current response date for technical proposals is June 2, 2026.
Purpose & Scope
The requirement is to furnish all materials, labor, tools, transportation, equipment, testing, and quality control necessary to repair the chilled water system at B2280. The contractor will be responsible for identifying all logistical, architectural, and structural work elements. The project involves work in airfield operations and controlled/restricted areas, requiring specific safety protocols and access procedures. Lead-based paint concerns have been identified, and affirmative procurement requirements for EPA-designated and USDA-designated biobased items apply.
Contract Details & Timeline
- Contract Type: Firm Fixed Price (anticipated)
- Procurement Method: Two-Step Sealed Bidding (FAR 14.5)
- Estimated Magnitude: More than $10,000,000
- Period of Performance: 440 calendar days after Notice to Proceed
- Set-Aside: Total Small Business Set-Aside (NAICS 236220, Size Standard $45M)
- Mandatory Site Visit: Was held April 10, 2026. Attendance was mandatory for eligibility.
- RFI Responses Published: May 4, 2026
- Technical Proposal Due: June 2, 2026 (anticipated, following formal RFP posting)
Evaluation & Submission
The procurement uses a Two-Step Sealed Bidding process:
- Step One (Technical Proposals): Evaluated on Capability & Management and Schedule & Planning. Proposals must achieve an "Acceptable" rating in all subfactors to proceed. No pricing information is submitted in Step One.
- Step Two (Price Bids): Only technically acceptable offerors from Step One will submit sealed price bids. Award will be made to the responsible bidder with the lowest evaluated price, considering reasonableness, completeness, balanced pricing, and realism.
- Submission Requirements: Electronic submission via email or DoD Safe. Files must be text-searchable PDFs, not password-protected, and no zip files. A 20% bid guarantee is required. Bidders must have a current assessment in the Supplier Performance Risk System (SPRS).
Key Requirements & Clarifications
- Personnel: Key personnel (PM, QCM, SSHO, Project Superintendent) require specific experience. All contractor personnel need FOD awareness training and AFMC Form 387 badges for base access. An EAL spreadsheet must be completed for base access.
- CUI: NIST SP 800-171 compliance verification is rescinded; prime contractors are responsible for CUI safeguarding.
- Financial: A 100% bid bond is required. Liquidated damages are $227.75/day. The cost of any utility transformer upgrade is the contractor's responsibility.
- Site Conditions: Geotechnical data and utility site maps are provided. An asbestos report indicates no asbestos detected in analyzed samples.
- FAR Clauses: Relevant clauses include those for Iran sanctions, construction proposal preparation, UAS prohibition, and facsimile bids.
Contacts
- Primary: Sharla Flowers (sharla.flowers_brandon.1@us.af.mil)
- Secondary: Michael Johnson (michael.johnson.404@us.af.mil, 4056202913)