TINKER AFB MAC BOA WWYK150083 - Repair Transformer Vault 6, B9001
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting proposals under Solicitation FA813726R0008 for the Repair of Transformer Vault 6, B9001 at Tinker Air Force Base, Oklahoma. This project, valued between $1,000,000 and $5,000,000, is a Total Small Business Set-Aside and is open exclusively to Tinker AFB MAC BOA holders. The work involves critical electrical infrastructure replacement and associated repairs.
Scope of Work
The project requires the repair and replacement of two gas-filled 2000KVA transformers, associated 480V switch gear (labeled #6C and #6D), all 15KV switches, and the original 3000A tie bus within Transformer Vault 6, B9001. These components have exceeded their rated life expectancy. Additional tasks include repairing interior lighting, adding visual fire alarm notification devices to meet ABA requirements, and repairing the vault's exterior. The Statement of Work (SOW) emphasizes furnishing all necessary materials, labor, tools, and services.
Key Requirements & Clarifications
- Electrical Components: Existing transformers are gas-filled (no PCBs). Busway transition will use custom adapters for the existing ITE XL-X busway. ION8650 meters are expected, with external mounting acceptable if switchgear mounting is not feasible. Arc-flash mitigation techniques are required, not arc-resistant gear.
- Site & Safety: Work is within Bldg. 9001, a controlled area requiring escorts; Entry Access Lists (EAL) and Vehicle Entry Access Lists (VEAL) must be submitted 14 days prior. The contractor must provide their own hoist system due to damage to the existing beam. Demo work must be phased to minimize production impact, requiring coordination with the user group.
- Standards: The project adheres to the 2025 Tinker AFB Electrical Standards and federal prevailing wage rates for Oklahoma County. No Class 1 Ozone Depleting Substances are required.
- Personnel: Key personnel (Project Manager, Quality Control Manager, Site Safety and Health Officer, Project Superintendent) must meet specific experience requirements. AFMC Form 387 is required for contractor badging.
- Documentation: Electronic submission of documents with digital signatures is required. A baseline schedule must be submitted within 10 days of Notice to Proceed (NTP), with monthly updates. A submittal register must be reviewed and revised within 10 days of NTP.
Contract Details & Timeline
- Contract Type: Firm Fixed Price.
- Magnitude: $1,000,000 to $5,000,000.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Period of Performance: 271 calendar days for completion, commencing 10 calendar days after NTP.
- Liquidated Damages: $277.75 per calendar day of delay.
- Mandatory Site Visit: An initial site visit was held on February 5, 2026, and attendance was required for eligibility to propose.
- Requests for Information (RFIs) Due: March 25, 2026, at 4:00 PM CST.
- Proposal Due Date: April 10, 2026, at 4:00 PM CST.
- Evaluation: Lowest Priced Technically Acceptable (LPTA) source selection procedures.
Contact Information
For inquiries, contact Sara Hinds (sara.hinds.2@us.af.mil) or Megan Donaghe (megan.donaghe@us.af.mil, 7303205014).