UPS System Maintenance

SOL #: 1232SA26Q0411Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Agricultural Research Service
USDA ARS AFM APD
BELTSVILLE, MD, 20705, United States

Place of Performance

Manhattan, KS

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components (J059)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 20, 2026
2
Last Updated
May 19, 2026
3
Submission Deadline
May 20, 2026, 11:30 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Agriculture (USDA) Agricultural Research Service (ARS) is soliciting proposals for Uninterruptible Power Supply (UPS) System Maintenance at the National Bio and Agro-Defense Facility (NBAF) in Manhattan, KS. This is a 100% Small Business Set-Aside for a Firm Fixed-Price requirements contract. A mandatory site visit is scheduled for May 5, 2026, and quotes are due May 20, 2026, at 6:30 AM CT.

Scope of Work

This opportunity requires all-inclusive maintenance and repair services for NBAF's Rectifier/Charger, Battery, and UPS Systems. Services include:

  • Preventative Maintenance: Semi-annual and annual inspections, servicing, cleaning, calibration, and performance reviews.
  • Service Calls and Repairs: Response to non-emergency and emergency repair requests, with emergency on-site presence required within six hours.
  • Parts and Materials: Reimbursement for pre-approved parts and materials used in repairs.
  • Optional Services: Battery and capacitor replacement for various UPS models as specified in optional Contract Line Item Numbers (CLINs).

Performance standards include 98% quality conformance, 100% emergency response within 6 hours on-site, and 100% compliance with site security and safety.

Contract & Timeline

  • Contract Type: Firm Fixed-Price Requirements Contract
  • Duration: One base year and four one-year option periods, not to exceed five years total.
  • Set-Aside: 100% Small Business
  • NAICS Code: 238210, Size Standard: $19 Million
  • Mandatory Site Visit: Tuesday, May 5, 2026, at 9:00 AM Central (US) at the NBAF Visitor Center.
    • Site Visit Registration Deadline: Tuesday, April 28, 2026. Requires completing "NBAF Visitor Application.pdf" and a background check via redtailsecurity.com/corp/NBAF. Failure to attend will disqualify an offer.
  • Requests for Information (RFIs) Due: May 11, 2026, at 12:00 PM Pacific Time.
  • Quotes Due: May 20, 2026, at 6:30 AM Central Time.
  • Submission: Email quotes to david.reynolds2@usda.gov with the subject "RFQ 1232SA26Q0411". Offerors must hold prices firm for 90 calendar days.

Evaluation

Award will be based on the greatest overall benefit to the government, considering technically acceptable offers and option prices. Past performance will be a significant factor. Offerors must submit pricing for all CLINs as detailed in Attachment 1 - Bid Schedule, rounding prices to the nearest dollar.

Special Requirements

Contractor personnel must be factory-authorized technicians for the equipment serviced and undergo background checks. Strict site access requirements, including REAL ID compliant identification and mandatory safety/security video viewing, apply. Required Personal Protective Equipment (PPE) for the site visit includes a hard hat, yellow safety vest, gloves, safety glasses, mask, closed-toe shoes, shoe covers, and long pants.

People

Points of Contact

David ReynoldsPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: May 19, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: May 12, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: May 11, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: May 11, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 24, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
View