DDWG Batteries

SOL #: SP330026Q0105Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA DISTRIBUTION
NEW CUMBERLAND, PA, 17070-5008, United States

Place of Performance

Warner Robins, GA

NAICS

Battery Manufacturing (335910)

PSC

Batteries, Rechargeable (6140)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 9, 2026
2
Last Updated
May 22, 2026
3
Submission Deadline
May 20, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) Distribution is soliciting quotes for Batteries and associated installation services at DLA Distribution Warner Robins, GA. This Request for Quotation (RFQ) aims to establish a single Firm-Fixed-Price (FFP) Purchase Order. This opportunity is a Total Small Business Set-Aside. Quotes are due by May 20, 2026, at 5:00 PM EDT.

Scope of Work

The contractor will provide labor and replacement batteries for the existing Eaton Uninterruptible Power Supply (UPS) system located at DLA Distribution Warner Robins. The scope includes:

  • Removal of old batteries from the UPS system.
  • Installation of new, specified batteries.
  • Palletizing all removed batteries for commercial pickup in Building 385. All services must be performed during standard business hours (8:30 am - 4:00 pm).

Key Requirements

The requirement is for 40 units of 12v Quick Connect, Lead Acid Batteries with 9Ah capacity. Specific technical specifications include:

  • UL94-HB and UL94V-0 Flammability rating
  • 130A at 5sec Maximum discharge current
  • 6 Cells per unit
  • 4W at 15 Minutes rate to 1.67V per cell at 25°C (77°F) capacity
  • 3.4A Recommended maximum charging current limit
  • HRL Series, similar or equal to CSB Battery of America Part Number HRL1234WF2FR or Network Part Number 27T6516. The original solicitation also specified dimensions: 98.3 mm H x 64mm D x 151mm W.

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP) Purchase Order.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 335910 (Battery Manufacturing) with a size standard of 1250 employees.
  • Product Service Code: 6140 (Batteries, Rechargeable).
  • Period of Performance: Delivery required within 60 Days After Receipt of Order (ARO).
  • Place of Performance: DLA Distribution Warner Robins, 455 Byron Street Bldg. 385, Robins AFB, GA 31098-1887.

Submission & Evaluation

Quotes must be submitted electronically via email to samuel.tustin@dla.mil. Facsimile and hard copy submissions will not be accepted. Quotes must be in whole cents, include a completed schedule of services, and all required documentation, with Controlled Unclassified Information (CUI) markings where applicable. Award will be made to the responsible quoter who complies with all terms, conditions, laws, and regulations, and offers the total overall lowest price for all contract line items. Past performance will be evaluated on an acceptable/unacceptable basis using the Supplier Performance Risk System (SPRS).

Key Dates & Contact

  • Offer Due Date: May 20, 2026, 5:00 PM EDT.
  • Site Visit: A site visit is scheduled for May 15, 2025, at 11:00 AM at DLA Distribution Warner Robins, Building 385. Participants must arrive 30 minutes early for security checks. While not mandatory, attendance is strongly urged.
  • Primary Contact: Samuel Tustin (samuel.tustin@dla.mil).

Additional Notes

Offerors must be registered in the System for Award Management (SAM) database. Invoicing and payment will be processed via Wide Area WorkFlow (WAWF).

People

Points of Contact

Samuel TustinPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Combined Synopsis/Solicitation
Posted: May 22, 2026
View
Version 7Viewing
Combined Synopsis/Solicitation
Posted: May 20, 2026
Version 6
Combined Synopsis/Solicitation
Posted: May 12, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: May 12, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: May 8, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
DDWG Batteries | GovScope