Tinker AFB 2026 Multiple Award Construction Contract (MACC)- Draft Request for Proposal (RFP)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force has released a Draft Request for Proposal (RFP) for the Tinker AFB 2026 Multiple Award Construction Contract (MACC), seeking industry feedback. This Indefinite Delivery, Indefinite Quantity (IDIQ) contract will cover a broad range of general construction services at Tinker Air Force Base, Oklahoma, including sustainment, maintenance, repair, alteration/renovation, and minor construction projects. Work will be complex, requiring multiple trades and potentially engineering design, with execution methods including Design-Build, Construction with Limited Design, or Construction Only.
Contract Details & Structure
This MACC is anticipated to be a 10-year contract (5-year base + 5-year option period) with an IDIQ ceiling of $950 million. The government intends to award to a maximum of 10 contractors. The acquisition will establish two contractor pools:
- Small Business Pool: For Task Orders under $10 million.
- Full and Open Pool: For Task Orders $10 million or above. Small businesses will have the opportunity to compete in both pools. The minimum guaranteed task order is $500 for a post-award conference.
Evaluation Criteria
Award will be based on the Highest Technically Rated Offeror (HTRO) with a Minimum Technical Threshold Rating (MTTR). There will be no cost/price evaluation at the IDIQ level. Evaluation factors include:
- Technical Experience: Covering relevant construction experience, design experience, certifications/licenses, and staffing. Offerors must meet MTTRs of 8,190 points (Appendix C) and 7,140 points (Appendix D).
- Past Performance: Evaluated for recency and relevancy, requiring an "Acceptable" rating. Proposals must be clear, concise, and substantiate all claimed points.
Key Action Items & Deadlines
This is a draft RFP for early industry engagement and feedback.
- Feedback Requested: Review the uploaded attachments, specifically "MACC Section L and M Industry Feedback" form, and send completed forms via email to sara.hinds.2@us.af.mil.
- Draft RFP Questions Due: By 1300 on 8 October (implied 2026).
- Windshield Tour: A site visit for interested parties will be held on 1 October at 0900. RSVP with the provided POCs by 24 September (implied 2026).
- Proposal Submission (Final RFP): Will be electronic via the Procurement Integrated Enterprise Environment (PIEE) Solicitation module. Offerors must be registered in SAM.gov. The planned award date is Q1 of CY 2027.
Contacts
- Primary: Hailie Reyes (hailie.reyes@us.af.mil)
- Secondary: Sara Hinds (sara.hinds.2@us.af.mil)