Wings & Fins Subassemblies

SOL #: FA855626RB013Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8556 AFLCMC EBGK COM
ROBINS AFB, GA, 31098-1811, United States

Place of Performance

Warner Robins, GA

NAICS

Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing (336419)

PSC

Guided Missile Components (1420)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 17, 2026
2
Last Updated
May 29, 2026
3
Submission Deadline
Jun 1, 2026, 7:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for Wing & Fins Subassemblies to support the AIM-120X and CATM-120X series of the Advanced Medium Range Air-to-Air Missile (AMRAAM). This is a Total Small Business Set-Aside. The Government intends to award a single contract. Proposals are due June 1, 2026.

Scope of Work

This notice serves as a formal SOLICITATION for the procurement of critical Wing and Fin Sub-Assemblies. The scope of work is identified within the Attachment 2 Statement of Work (SOW). These sub-components are required to support the AIM-120X and CATM-120X series of the Advanced Medium Range Air-to-Air Missile (AMRAAM).

Contract & Timeline

  • Type: Solicitation
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 1420 (Guided Missile Components)
  • Response Due: June 1, 2026, 7:30 PM ET
  • Published: May 4, 2026, 12:54 PM ET
  • Place of Performance: Warner Robins, GA 31098, United States

Evaluation & Award Criteria

This acquisition will utilize the Lowest Price, Technically Acceptable (LPTA) source selection procedure, in accordance with FAR 15.103-2 and DoD Source Selection Procedures. The Government will evaluate only one proposal from each offeror. Award will be made to the responsible offeror whose proposal:

  • Is determined to be technically acceptable.
  • Conforms to all solicitation requirements (terms and conditions, representations, certifications, and technical requirements).
  • Has the lowest Total Evaluated Price among the technically acceptable offerors. The Government does not imply, nor is it the Government's intention, to conduct the evaluations in sequential order (i.e., technical evaluation does not necessarily have to precede price evaluation).

Technical Evaluation Factors (Equally Important):

  • Subfactor One: Wing and Fin Packaging, Handling, Shipping and Transportation Solution
  • Subfactor Two: Wing and Fin Production Plan
  • Subfactor Three: Finished/In Process Product Verification Plan
  • Subfactor Four: Honeycomb Implementation

Additional Notes

Regarding the First Article timeline, the Government estimates that production of the two (2) First Article units will require six (6) to twelve (12) months, followed by an additional six (6) to twelve (12) months for First Article Testing (FAT) prior to full-rate production. Therefore, the Government anticipates mass delivery to occur in 2029, contingent upon successful FAT and validation of a viable product.

People

Points of Contact

Dillan Harper-SmithPRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 8
Solicitation
Posted: May 29, 2026
View
Version 7
Solicitation
Posted: May 14, 2026
View
Version 6
Solicitation
Posted: May 11, 2026
View
Version 5
Solicitation
Posted: May 11, 2026
View
Version 4
Solicitation
Posted: May 11, 2026
View
Version 3
Solicitation
Posted: May 7, 2026
View
Version 2Viewing
Solicitation
Posted: May 4, 2026
Version 1
Solicitation
Posted: Apr 17, 2026
View