Wings & Fins Subassemblies

SOL #: FA855626RB013Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8556 AFLCMC EBGK COM
ROBINS AFB, GA, 31098-1811, United States

Place of Performance

Warner Robins, GA

NAICS

Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing (336419)

PSC

Guided Missile Components (1420)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 17, 2026
2
Last Updated
May 29, 2026
3
Submission Deadline
Jun 1, 2026, 7:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for Wing and Fin Sub-Assemblies to support the AIM-120X and CATM-120X series of the Advanced Medium Range Air-to-Air Missile (AMRAAM). This is a formal Solicitation under a Total Small Business Set-Aside. The Government intends to award a single contract for these critical sub-components. Proposals are due June 1, 2026.

Scope of Work

The scope of work, detailed in Attachment 2 Statement of Work (SOW), involves the procurement of Wing and Fin Sub-Assemblies. These are critical sub-components required for the AMRAAM missile series.

Contract & Timeline

  • Type: Single contract award
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 1420 (Guided Missile Components)
  • Place of Performance: Warner Robins, GA
  • Proposal Due: June 1, 2026, 7:30 PM UTC
  • Published: May 7, 2026

Evaluation & Award Criteria

This acquisition will utilize the Lowest Price, Technically Acceptable (LPTA) source selection procedure, in accordance with FAR 15.103-2 and DoD Source Selection Procedures. Award will be made to the responsible offeror whose proposal is technically acceptable, conforms to all solicitation requirements, and has the lowest Total Evaluated Price. Only one proposal per offeror will be evaluated.

Technical Evaluation Factors (equally important):

  • Wing and Fin Packaging, Handling, Shipping and Transportation Solution
  • Wing and Fin Production Plan
  • Finished/In Process Product Verification Plan
  • Honeycomb Implementation

Additional Notes

The Government clarified that the First Article timeline involves 6-12 months for production of two units, followed by 6-12 months for First Article Testing (FAT). Mass delivery is anticipated in 2029, contingent upon successful FAT. Drawings previously under Notice ID: FA8556-25-R-B016 have been added to this notice. Contact Ivan Jones (ivan.jones.2@us.af.mil) for questions regarding drawings.

People

Points of Contact

Dillan Harper-SmithPRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 8
Solicitation
Posted: May 29, 2026
View
Version 7
Solicitation
Posted: May 14, 2026
View
Version 6
Solicitation
Posted: May 11, 2026
View
Version 5
Solicitation
Posted: May 11, 2026
View
Version 4
Solicitation
Posted: May 11, 2026
View
Version 3Viewing
Solicitation
Posted: May 7, 2026
Version 2
Solicitation
Posted: May 4, 2026
View
Version 1
Solicitation
Posted: Apr 17, 2026
View
Wings & Fins Subassemblies | GovScope