Service Air Compressor Replacement

SOL #: FA910126QB018_ServiceAirCompressorCombined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA9101 AEDC PKP PROCRMNT BR
ARNOLD AFB, TN, 37389-1332, United States

Place of Performance

COOPERTOWN, TN

NAICS

Air and Gas Compressor Manufacturing (333912)

PSC

Compressors And Vacuum Pumps (4310)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 13, 2026
2
Last Updated
Apr 3, 2026
3
Submission Deadline
Apr 1, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, through the AEDC PKP PROCRMNT BR, is soliciting quotes for the Service Air Compressor Replacement at AEDC Building 651, Arnold AFB, TN. This 100% Total Small Business Set-Aside opportunity requires the procurement, demolition, installation, and commissioning of two (2) new 50hp Rotary Service Air Compressors. Quotes are due by Wednesday, April 1, 2026, at 1:00 PM Central Time.

Scope of Work

The requirement is for two (2) 50hp New Rotary Service Air Compressors, each capable of ≥ 220 CFM at 115 psig. The scope includes:

  • Demolition and removal of two existing compressors.
  • Installation of the new compressors within the existing 15'6"x14'5" concrete pad envelope.
  • Furnishing all necessary equipment, rigging, and piping for air discharge, condensate drains, and water discharge.
  • Extending electrical supply to the backside of the 480V disconnect for each compressor (vendor responsibility).
  • Initial start-up, operational check-out, and commissioning by factory-trained technicians.
  • Basic operator training and a detailed maintenance schedule.
  • A written report validating operation per OEM specifications. The installation area is indoors on the ground floor of the VKF Plant building, accessible via large roll-up doors. AEDC will provide a 40T overhead crane and/or forklift for installation lifts. The government will be responsible for the disposal of existing compressors.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation (RFQ)
  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5)
  • NAICS: 333912 (Air and Gas Compressor Manufacturing), 1,000 employee size standard.
  • Contract Type: Purchase Order (anticipated).
  • Evaluation: Lowest Priced Technically Acceptable.
  • Delivery: All items and services must be delivered within 3 Months After Receipt of Order (ARO) to Arnold AFB.
  • Special Requirements: Unlimited Data Rights for technical data/reports, Quality Control Plan (QCP) required. The Buy American Act (FAR 52.225-1) applies.

Key Dates & Actions

  • Quote Due Date: Wednesday, April 1, 2026, 1:00 PM Central Time.
  • Questions Due Date: Friday, March 27, 2026, 10:00 AM CST.
  • Virtual Information Exchange: The previously scheduled physical site visit is canceled. A virtual information exchange will replace it. Interested parties must email their company name, attendee name(s), and email address to the POC by March 26, 2026, at 10:00 AM CST to receive an invitation.
  • Submission: Quotes must include a technical solution, expected delivery date, confirmation of all-inclusive pricing, and a completed Pricing Worksheet (Attachment 2). All prices must be in USD and include travel and administrative support.

Important Notes

Vendors must be registered in SAM.gov and ensure their registration is current. Attachment 3 contains updated FAR/DFARS clauses. The government has adequate air storage and existing desiccant dryer, tank, and filter/oil water separator; however, suggestions for improving the condensation collection system are welcome.

People

Points of Contact

Paytonne SzatkowskiPRIMARY
Brooke VandemanSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: Apr 3, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Mar 23, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 20, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 18, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 13, 2026
View