Service Air Compressor Replacement

SOL #: FA910126QB018_ServiceAirCompressorCombined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA9101 AEDC PKP PROCRMNT BR
ARNOLD AFB, TN, 37389-1332, United States

Place of Performance

COOPERTOWN, TN

NAICS

Air and Gas Compressor Manufacturing (333912)

PSC

Compressors And Vacuum Pumps (4310)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 13, 2026
2
Last Updated
Apr 3, 2026
3
Submission Deadline
Apr 1, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting quotes for the Service Air Compressor Replacement at AEDC Building 651, Arnold Air Force Base, TN. This requirement, a Combined Synopsis/Solicitation, is 100% set aside for Small Businesses and involves the procurement, demolition, installation, and commissioning of two (2) new 50hp rotary service air compressors. Quotes are due by Wednesday, April 1, 2026, at 1:00 PM Central Time.

Scope of Work

The objective is to restore and improve service air capabilities by replacing existing compressors. Key tasks include:

  • Procurement of two (2) 50hp new rotary service air compressors (≥ 220 CFM each, 115 psig).
  • Demolition and removal of two (2) existing compressors.
  • Installation of new compressors within the existing 15'6"x14'5" concrete pad footprint.
  • Furnishing equipment and rigging for removal and replacement.
  • Installation of welded black iron piping for air discharge and new piping/fittings for condensate drains and water discharge.
  • Vendors are responsible for making electrical connections to the backside of the 480V disconnect.
  • Initial start-up, operational check-out, and commissioning by factory-trained technicians.
  • Basic operator training and provision of a detailed maintenance schedule.
  • Submission of a written report validating compressor operation per OEM specifications.

Contract & Timeline

  • Type: Combined Synopsis/Solicitation (RFQ) leading to a Purchase Order.
  • Set-Aside: Total Small Business Set-Aside.
  • NAICS: 333912 (Air and Gas Compressor Manufacturing), Size Standard: 1,000 employees.
  • Delivery/Period of Performance: All items and services must be delivered/completed within 3 Months After Receipt of Order (ARO).
  • Quote Due: Wednesday, April 1, 2026, 1:00 PM Central Time.
  • Questions Due: Friday, March 27, 2026, 10:00 AM Central Time.
  • Published: March 24, 2026.

Submission & Evaluation

Bidders must submit a technical quote/solution, expected delivery date, a statement confirming the total quoted price is all-inclusive, and a completed Pricing Worksheet (Attachment 2 - Updated). Quotes must remain firm for 30 calendar days. Award will be based on the lowest priced technically acceptable quote. All vendors must be registered in SAM.gov. The Buy American Act applies to this acquisition.

Key Clarifications & Events

  • A Virtual Information Exchange is scheduled for Thursday, April 2, 2026, from 10:00 AM to 11:00 AM CST. This session will include photographs of work areas and a Q&A. Interested parties must RSVP by March 26, 2026, 10:00 AM CST by emailing Company Name, Attendee Name(s), and Email Address to Ms. Paytonne Szatkowski (paytonne.szatkowski@us.af.mil).
  • The physical site visit previously scheduled was canceled.
  • AEDC will provide a 40T overhead crane/forklift for installation lifts and will be responsible for the disposal of existing compressors.
  • Vendors are encouraged to suggest improvements for the existing condensation collection system.

People

Points of Contact

Paytonne SzatkowskiPRIMARY
Brooke VandemanSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: Apr 3, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View
Version 6Viewing
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Mar 23, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 20, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 18, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 13, 2026
View